ReferenceItem

General
Plant id (PlantId)
P33
Heading (Heading)
150 MWe boiler delivery
Power station (PowerStation)
Hazira power plant
Owner (Owner)
Essar Power
City (City)
Hazira
Country (Country)
India
Region (Region)
Asia and Oceania
Latitude (Latitude)
21,175487
Longitude (Longitude)
72,677329
O&M (OMText)
O&M start (OMStart)
Fuel (Fuel)
Content text (ContentText)
Images
Image 1 (Image1)
/Files/Files/Images/References/BWE-Boiler-power-plant.jpg
Image 2 (Image2)
Image 3 (Image3)
Image 4 (Image4)
Image 5 (Image5)
Image 6 (Image6)
Scope
EPC turnkey (EPCTurnkey)
False
Service (Service)
False
IPP investment (IPPInvestment)
False
O&M (OM)
False
Boiler supply (BoilerSupply)
True
All (All)
True
Solution
Engine-based (EngineBased)
False
Renewables (Renewables)
False
Combined heat and power (CombinedHeatAndPower)
False
Power barge (PowerBarge)
False
Hybrid (Hybrid)
False
Off-grid (OffGrid)
False
Technology
TSA (TSA)
False
Technical service (TechnicalService)
False
Training (Training)
False
CMMS (CMMS)
False
Chemical cleaning (ChemicalCleaning)
False
Major overhaul (MajorOverhaul)
False
Major service (MajorService)
False
Boilers (Boilers)
True
Heaters (Heaters)
True
Burners (Burners)
True
Firing systems (FiringSystems)
False
Conversions (Conversions)
False
Two stroke (TwoStroke)
False
Four stroke (FourStroke)
False
Biomass (Biomass)
False
Biogas (Biogas)
False
Waste-to-energy (WasteToEnergy)
False
Solar (Solar)
False
Storage (Storage)
False
Wind (Wind)
False